香港滑雪論壇  
返回   香港滑雪論壇 > 滑雪旅遊區 > 滑雪場資料 > 美加地區滑雪場

通知
回覆
 
主題工具 顯示模式 Google 翻譯
舊 2013-01-19, 20:21   #1
Mike
超級版主
 
Mike 的頭像
 
註冊日期: 2008-05-19
住址: HK
文章: 4,358
Mike 正向着好的方向發展
Whistler improvement plan for 2013-14 season

WHISTLER BLACKCOMB ANNOUNCES MAJOR $18 MILLION CAPITAL EXPANSION FOR 2013.2014
Lift Expansion Includes New Whistler Mountain Harmony High-Speed Six-Pack Chairlift And New High-Speed Quad Chairlift In Blackcomb Mountain’s Crystal Zone

WHISTLER, BC, January 18, 2013 – Whistler Blackcomb has unveiled capital plans for a major lift expansion. Whistler Mountain’s Harmony high-speed, quad chairlift will be replaced with a new Doppelmayr high-speed, detachable, six-pack chairlift capable of transporting six people on each chair. Blackcomb Mountain will see a lift enhancement with a high-speed quad chairlift going into a new area in the Crystal Zone, currently accessed by a fixed-grip triple chair.

“This lift expansion clearly demonstrates our commitment to continuously enhance the skiing and riding experience on both mountains,” says Dave Brownlie, President and Chief Executive Officer, Whistler Blackcomb. “Each zone the new lifts will service is unique and much-loved by Whistler locals and destination guests alike. The capital we are investing to enhance our already amazing experiences will make Whistler Blackcomb even better.”

The new high-speed quad chairlift in the Crystal Zone will be 1,708 metres in length, with a vertical rise of 535 metres. Skier carrying capacity will increase by 65 per cent over the current lift to 2,400 skiers per hour. The new quad will deliver skiers and riders to the same location as the current triple chair next to the Crystal Hut. However, the aspect of the new lift line is dramatically different, and will originate 158 metres lower than the old Crystal lift. The bottom elevation will be 1,292 metres and the top elevation of the lift will be 1,827 metres.

This bottom terminal location along the Blackcomb Glacier Road ski-out eliminates the need to utilize the Excelerator Chair to access many Crystal Zone trails including Ridge Runner, Rock ‘N’ Roll, and gladed trails like Outer Limits. It will be even quicker to return to the Glacier Express chair to access Horstman Glacier, Blackcomb Glacier and Spanky’s. The increased length of the chair’s line will give skiers and riders the opportunity to lap the entire Crystal Zone – from undulating cruisers to gladed zones riddled with natural terrain features and snow-caked trees straight out of a Dr. Seuss book. The name of this exciting new quad chairlift will be determined through a competition to be announced by Whistler Blackcomb later this winter.

The Harmony Six high-speed chairlift will replace one of Whistler Blackcomb’s most popular lifts and will dramatically improve the uphill capacity by 50 per cent; going from 2,400 skiers per hour to 3,600. The Harmony Six will service terrain spanning from the edge of the Symphony Amphitheatre all the way over to Glacier Bowl, adjacent to the Peak Express. This area, known as the Harmony Zone, makes up over 485 hectares of Whistler Blackcomb’s 3,306 hectares of total terrain. With a wide variety of beginner to expert terrain options, the Harmony Six will ensure skiers and riders are able to spend more time on the mountain exploring the spectacular, powder-covered alpine that Whistler Blackcomb is celebrated for.

The Harmony Six has the same alignment as the current Harmony quad; spanning 1,729 metres in length, with a vertical rise of 525 metres. The top elevation of the lift is 2,107 metres; the bottom elevation is 1,582 metres.

Construction on the lifts will begin this spring and will continue through the summer and fall with an expected opening at the beginning of the 2013-2014 winter season.

http://www.whistlerblackcomb.com/the...S_01_E1_130118
Mike 目前離線   回覆時引用此篇文章
回覆

書籤

主題工具
顯示模式

發文規則
不可以發表新主題
不可以發表回覆
不可以上傳附件
不可以編輯自己的文章

啟用 BB 代碼
論壇啟用 表情符號
論壇啟用 [IMG] 代碼
論壇禁用 HTML 代碼
論壇跳轉


所有時間均為香港時間。現在的時間是 21:42

Hong Kong Snowboard & Ski Association
Copyright © 2003 - 2018